Share a captive plant. Use its power as your own.

In a group captive project, several consumers take equity in one renewable plant and use its power with captive status.

Structured for captive rulesSolar, wind or hybridMW-scale delivery

What it is.

A group captive plant is owned by a special purpose company in which the consumers hold equity. Together they must hold at least 26% of the equity and consume at least 51% of the power, under the Electricity Rules, 2005, for the plant to keep captive status.

Like any captive plant, power taken over the grid is not charged the cross-subsidy surcharge that third-party purchases pay. Other state charges still apply.

  • Large, steady consumption
  • Willingness to hold equity in a plant
  • Interest in captive benefits without building alone
  • Operations in a state with supportive captive rules

One plant, several owners, two conditions.

The users meet the captive conditions together, in proportion to their share.

26%

Shared ownership

The captive users together hold at least 26% of the plant's equity.

51%

Shared consumption

The captive users together consume at least 51% of its power in the year.

Why companies choose group captive.

Lower landed cost

No cross-subsidy surcharge on captive power taken over the grid.

Shared investment

Each user holds equity in line with the power it takes.

MW scale without land

The plant is built where land and sun are best.

Long-term visibility

Power from a plant you part-own, at a cost you can plan.

How it works.

  1. Step 1

    Feasibility

    Load, location and captive structure.

  2. Step 2

    Structure

    Special purpose company, equity and power agreements.

  3. Step 3

    Build

    Plant designed and constructed.

  4. Step 4

    Supply

    Power delivered with captive status, conditions tracked each year.

Who group captive suits, and who it does not.

Group captive suits large consumers with steady loads who can hold equity for the long term. NITI Aayog's MSME roadmap (January 2026) notes that group captive is capital-intensive and can be hard for smaller firms.

If you are a smaller business, a solar PPA or rooftop solar on your own site may fit better. We will tell you which.

Large plants we have built.

8 MW open access solar plant, Balsamad
8 MWBalsamad
5 MW open access solar plant, Neemuch
5 MWNeemuch
5.2 MW pm-kusum solar plant, Semalda
5.2 MWSemalda
3.6 MW pm-kusum solar plant, Nimbola
3.6 MWNimbola
2.4 MW pm-kusum solar plant, Kotari Kalan
2.4 MWKotari Kalan
8 MWKhirkiya
7.5 MWDatwada

Questions buyers ask

What are the captive conditions?

Captive users together must hold at least 26% of the equity and consume at least 51% of the power generated, under the Electricity Rules, 2005.

How much do I need to invest?

Your equity share depends on your share of the power. The proposal sets out the structure and amounts.

What happens if consumption drops?

The 51% consumption condition must hold each year. We size the plant and structure the agreements with this in mind.