A captive plant is owned by your company and generates power mainly for your own use, on your site or off site and delivered over the grid.
Structured for captive rules·On site or off site·MW-scale delivery
A plant counts as captive when the user owns at least 26% of it and consumes at least 51% of the power it generates in a year, under the Electricity Rules, 2005.
Power you take from your own captive plant over the grid is not charged the cross-subsidy surcharge that applies when you buy from a third party. Other charges, such as transmission and wheeling, still apply as your state sets them.
We size the plant and structure ownership so both hold every year.
The captive user holds at least 26% of the equity in the plant.
The captive user consumes at least 51% of the power generated in the year.
Under the Electricity Rules, 2005. The consumption condition is checked on the year's generation.
Load, land, grid access and charges for your state.
Ownership set up on your books or in a special purpose company.
Land, connectivity and open access approvals where the plant is off site.
Design, procurement and construction.
Power scheduled to your plant, with the captive conditions tracked.
| Captive power | Group captive | |
|---|---|---|
| Who owns the plant | Your company | Several companies together |
| Ownership rule | You hold at least 26% | The users together hold at least 26% |
| Consumption rule | You use at least 51% of the power | The users together use at least 51% |
| Best for | One large consumer | Several consumers sharing one plant |
Open access, ground-mount and MW-scale plants built by our own teams.






Yes. Many captive plants are built where land is available and supplied to the user over the grid under open access.
The 51% consumption condition is checked each year. We size the plant with your consumption forecast in mind.
No. You need at least 26% of the equity. The rest can be held by other investors, often in a special purpose company.
Transmission, wheeling, banking and other charges set by your state can apply. Our feasibility study lists them for your connection.